Book a demo
NABL

Common NABL non-conformities and how to avoid them

Common NABL non-conformities in testing labs, clause by clause: records, traceability, validation, uncertainty, holding times, reports and data control.

By Nikhil Chouhan, Founder, Tanush DigitalLast updated 11 min read

On this page
  1. How do NABL assessors find non-conformities?
  2. Why are technical records the most exposed area?
  3. What traceability problems do assessors look for?
  4. What do assessors check on method validation and verification?
  5. What goes wrong with measurement uncertainty?
  6. How is calibration status checked?
  7. Why do sample receipt and holding times cause findings?
  8. Which report errors turn into findings?
  9. What are impartiality findings about?
  10. What is "control of data" and why does Excel fail it?
  11. Registers and Excel compared with a controlled system
  12. A NABL audit checklist for your own mock assessment
  13. How should a lab respond to a NABL non-conformity?
  14. Where Tanush LIMS fits
  15. Frequently asked questions
  16. Sources

A NABL non-conformity is a finding, raised by the assessment team, that a lab does not meet a requirement of ISO/IEC 17025:2017, NABL's specific criteria or NABL policy. The common ones in testing labs cluster around technical records, traceability, method verification, measurement uncertainty, sample handling, report content and control of data.

NABL does not publish statistics on which findings are most frequent, and we have not invented any. This guide works from the requirements instead, so you can anticipate NABL assessment findings: what the standard asks, what assessors often look at to test it, and where manual registers and Excel tend to leave gaps.

How do NABL assessors find non-conformities?

Assessors find non-conformities by tracing real work and witnessing tests. NABL 100B says the assessment team checks that the documented system is implemented and effective, and that the lab's technical competence is "evaluated and witnessed during the assessment".

In practice an assessor picks an issued report and walks it backwards: report, review, worksheet, raw data, reagent standardisation, equipment, analyst authorisation, sample receipt, contract. Each link must exist and agree with the others. A gap anywhere in that chain becomes a finding.

NABL 100B then gives the lab 30 days to submit corrections and corrective actions based on root cause analysis, with documentary evidence.

Why are technical records the most exposed area?

Technical records carry every result, so any weakness in them affects everything else. ISO/IEC 17025 clause 7.5.1 requires original observations, data and calculations to be recorded at the time they are made, with the date and the person responsible for each activity and for checking. Clause 7.5.2 requires amendments to be traceable to the original, with both versions kept.

Assessors often look at:

  • titres or readings copied later from rough paper into a fair register;
  • overwriting or correction fluid instead of a single line with initials and date;
  • Excel sheets where a result cell was retyped and the earlier value is gone;
  • no record of who checked the calculation.

What traceability problems do assessors look for?

Assessors look for an unbroken chain from each result to SI units or a stated reference. Clause 6.5 and NABL 142 require calibration by a competent laboratory, or certified reference materials from a competent producer.

Typical gaps they check:

  • calibration certificates from a lab whose scope does not cover the instrument or range used;
  • reference standards or CRMs without a valid certificate, or used after expiry;
  • volumetric glassware, thermometers and weights with no calibration record;
  • working standards prepared in the lab with no link back to a certified material.

What do assessors check on method validation and verification?

Assessors check that every method in the scope was verified before use, and that non-standard or modified methods were validated. Clause 7.2.1.5 requires a lab to verify that it can perform a standard method and to keep records; clause 7.2.2 requires validation for non-standard, lab-developed or modified methods.

Common weak points include:

  • verification done once on an older edition, then not repeated when the standard was revised;
  • a "standard" method run with a changed sample volume or reagent, with no validation;
  • LOD and LOQ quoted in the scope but not supported by data;
  • clause 7.2.1.3 not met because the lab still uses a superseded edition.

What goes wrong with measurement uncertainty?

What goes wrong most is an uncertainty estimate that exists on paper but does not reflect how the method is run. Clause 7.6.3 requires a testing lab to evaluate measurement uncertainty, and NABL 141 is NABL's guideline for doing it.

Assessors often look at:

  • budgets missing major contributions, such as sampling or recovery;
  • the same uncertainty used across very different concentration ranges;
  • uncertainty not considered when a result sits close to a limit and the report says "complies" (clause 7.8.3.1).

How is calibration status checked?

Calibration status is checked at the bench, not only in the register. Clause 6.4.8 requires equipment to be labelled or coded so users can see its calibration status; clause 6.4.9 requires faulty or overdue equipment to be taken out of service; clause 6.4.13 lists the records to keep.

The classic finding: the register shows a balance overdue, but the worksheet from last week records weighings on it. A paper register cannot stop that. Intermediate checks (clause 6.4.10) without a written procedure, and records that miss the next due date, are also common. Our guide on instrument calibration in a testing lab covers the calibration programme itself.

Why do sample receipt and holding times cause findings?

They cause findings because evidence is lost at the busiest desk in the lab. Clause 7.4 requires a procedure for receipt, handling, storage and disposal, unambiguous identification, and recording of any deviation found at receipt. When the item is unsuitable, the lab must consult the customer and, if testing goes ahead, state in the report which results may be affected.

Assessors often look at:

  • the date and time of sampling missing, so nobody can show the method's holding time was met;
  • a sample received short or warm, tested anyway, with no customer consent and no note on the report;
  • sample codes written by hand that do not match the worksheet;
  • storage temperature records with gaps on Sundays and holidays.

Which report errors turn into findings?

Report errors that turn into findings are usually missing clause 7.8.2.1 content or misuse of the NABL symbol. Examples assessors often look at include:

  • no statement that results relate only to the items tested;
  • no date of analysis, or a date that does not match the worksheet;
  • "complies" printed with no decision rule documented (clause 7.8.6);
  • non-accredited parameters printed under the NABL symbol, or marked with an asterisk, which NABL 133 does not permit;
  • an amended report that does not identify the change and the reason (clause 7.8.8).

Our guide to the NABL test report format covers each rule.

What are impartiality findings about?

Impartiality findings are about risks the lab has not identified or controlled. Clause 4.1.4 requires the lab to identify risks to impartiality on an ongoing basis, from its activities, relationships and staff; clause 4.1.5 requires it to show how they are removed or reduced.

Assessors often ask how the lab stops commercial pressure reaching the analyst, for example when a large customer's results are near a limit. A risk register that was filled once and never reviewed is a common weak point.

What is "control of data" and why does Excel fail it?

Control of data is clause 7.11: any system that collects, processes, records, reports or stores data must be validated before use, protected from unauthorised access, safeguarded against tampering and loss, and have its calculations and data transfers checked. Note 1 to clause 7.11.2 says this covers non-computerised systems too.

A shared Excel workbook fails it in predictable ways: formula cells anyone can edit, no record of who changed what, one copy on one PC, and no tested backup. Clause 8.4.2 adds control of back-up, archive and retention for records. Our guide to the hidden cost of Excel in labs looks at this in detail.

Registers and Excel compared with a controlled system

The table below maps each area to the clause, the gap that manual methods tend to leave, and what closes it, whether paper-based or software-based.

AreaClauseGap that registers and Excel tend to leaveWhat closes it
Raw data7.5.1Readings copied later; checker not recordedRecord at the bench; named checker and date
Corrections7.5.2Overwritten cells, lost originalsKept versions with reason, person and date
Calculations7.11.6Formula cells edited or dragged wronglyLocked, versioned formulas checked against examples
Calibration status6.4.8, 6.4.9Overdue instrument still usedStatus visible at the point of use; overdue blocked from records
Holding time7.4Sampling time missing; late start unnoticedStart-by time from sampling time; late starts reported
Sample condition7.4.3Short or warm sample not recordedDeviation recorded at receipt; customer consent; note on report
Review7.8.1.1Signature on a printout, not on the dataReview and authorisation recorded before release
Data security7.11.3, 8.4.2One PC, no access control, no tested backupUser roles, audit trail, scheduled backups with a second copy

A NABL audit checklist for your own mock assessment

Before a NABL assessment, run your own trace on a few recent reports. NABL publishes its forms for this: NABL 219 (assessment forms and checklist) and NABL 220 (document review checklist), both based on ISO/IEC 17025:2017.

  1. Pick three issued reports from different sections, including one amended report.
  2. For each, find the contract review and the sample receipt record, with date and time of sampling.
  3. Check the holding time was met, or that a late start is reported.
  4. Open the worksheet and raw data; recalculate one result by hand.
  5. Check the analyst was authorised for that test on that date.
  6. Check every instrument used was within calibration on that date, with a traceable certificate.
  7. Check the reagent standardisation and QC result for that batch.
  8. Check the uncertainty estimate and decision rule behind any "complies".
  9. Check the report against clause 7.8.2.1 and NABL 133.
  10. Check you can restore the data from last month's backup.

How should a lab respond to a NABL non-conformity?

A lab should respond with correction, root cause and corrective action, backed by evidence, within the 30 days NABL 100B allows. Clause 8.7 of ISO/IEC 17025 sets the steps: control and correct the problem, find its cause, check whether similar problems exist elsewhere, act, and review whether the action worked.

"Retrained the analyst" alone rarely closes a finding, because it does not show why the error happened or that it cannot recur. Show the changed procedure, form or system, and records made since the change.

Where Tanush LIMS fits

Tanush LIMS closes several of the record gaps above for testing labs. Analysts type readings once and, in Formula mode, results calculate from each method's formula, which is checked against worked examples before it can go live. Results lock after approval; sending a test back keeps the earlier run with the reason; an audit log records changes. At inward it records bottle quantities and customer consent for short samples, shows holding-time start-by times and lists the tests to start first, and marks late starts on the report.

The equipment register shows calibration due dates, and an overdue instrument is greyed out on the worksheet so results cannot be recorded against it; recording the instrument is optional, though. Analysts work on sample codes without seeing the customer, and backups run every 3 hours with an optional copy to USB. It does not handle NCRs, internal audits, training, PT or documents, and it does not calculate measurement uncertainty, so those stay in your QMS. See the NABL LIMS page or book a demo.

Frequently asked questions

How long does a lab get to close NABL non-conformities?

NABL 100B gives the lab 30 days to submit corrective action based on root cause analysis, with documentary evidence. The accreditation committee reviews the report after that.

What is the difference between a correction and a corrective action?

A correction fixes the problem found, such as reissuing a wrong report. A corrective action removes its cause so it does not recur; ISO/IEC 17025 clause 8.7.1 asks for both, plus a check that similar problems do not exist elsewhere.

Does NABL publish a checklist for assessments?

Yes. NABL 219 is the assessment forms and checklist based on ISO/IEC 17025:2017, and NABL 220 is the document review checklist. NABL 218A is a checklist for annual surveillance.

Can using Excel itself be a non-conformity?

Not by itself. Clause 7.11 allows any system, paper or electronic, if it is validated, protected against tampering and loss, and its calculations are checked. Findings arise when those controls are missing.

Do non-conformities stop accreditation?

They can delay it. NABL 100B says reports with no non-conformities go to the committee early, while a total system failure or fraud can lead to denial. Most findings are closed through corrective action.

Who should answer a non-conformity in the lab?

The person responsible for the area, with the quality manager checking the root cause and evidence. Clause 8.7 requires the lab to review whether each corrective action was effective.

Sources

See a sample go from inward to issued report.

Book a 20-minute demo. Send us one of your current report formats first, and we will walk you through it on the call. We reply within 24 hours.